GPR lines over the Hercules Leg Cave
GPR data collection on Hercules Leg was done over three days on the surface of the cave and one day in the cave itself.
link to download the raw GPR data and the corresponding GPS files for the day1.
link to download the raw GPR data and the corresponding GPS files for the day2.
link to download the raw GPR data and the corresponding GPS files for the day3.
link to download the raw GPR data and corresponding GPS files for inside the cave.
[Page is under construction, processed figures will be uploaded soon.]